Archive for October, 2009

Busy month

Alot of work has been completed in the month just gone.

Firstly have painted the Onevia, GMC gunmetal grey.

The Silvia is getting closer to where it should be, Have Stripped out the interior, Installed 6 point cage(Cheers to Tim at TTT Auto engineering 021 267 1793), Harness’s in, Installed Rear subframe bushes, Installed Lock diff. Had a play with wheel setup, going to run 18×9.5 +5 front, rear will be 17×9.5 -7.  Have a few trackdays lined up so will be updated with proper pics.

Tag Cloud